搜索结果: 1-7 共查到“核科学技术 Method”相关记录7条 . 查询时间(0.109 秒)
New method ensures integrity of Savannah River’s radioactive material containers(图)
萨凡纳河 放射性物质 容器完整性
2024/3/7
Investigation of level spacing distribution of nuclear energy levels by maximum likelihood estimation method
nuclear energy levels maximum likelihood estimation method Nuclear Theory
2011/10/11
Abstract: The nearest neighbor spacing distribution (NNSD) is one of common methods in statistical analysis of nuclear energy levels. In this paper, we have proposed Maximum Likelihood Estimation (MLE...
Approaches, Relevant Topics, and Internal Method for Uncertainty Evaluation in Predictions of Thermal-Hydraulic System Codes
Uncertainty Evaluation Thermal-Hydraulic System Codes
2009/9/3
The evaluation of uncertainty constitutes the necessary supplement of best-estimate calculations performed to understand accident scenarios in water-cooled nuclear reactors. The needs come from the im...
GRS Method for Uncertainty and Sensitivity Evaluation of Code Results and Applications
GRS Code Results Applications
2009/9/3
During the recent years, an increasing interest in computational reactor safety analysis is to replace the conservative evaluation model calculations by best estimate calculations supplemented by unce...
核电厂船运事故评价方法(The Assessment Method for Transportation Event Near the Nuclear Power Plant)
核电厂 船运事故 概率方法
2008/11/19
从分析事件发生概率的角度(不对放射性后果作评价)介绍了一种判断是否需在滨海核电厂设计中考虑核电厂厂址附近航线上油气船只在发生不测期间所运输物品发生爆炸对核电厂安全的不利影响的方法,该方法已在岭澳核电站的安全分析中得到应用。
划分弥散地震区的原则和方法(The Principle and Method for Identification of Diffuse Zone)
核电厂 弥散地震 弥散地震区
2008/11/19
本文简要介绍了划分弥散地震区的原则和方法以及划分地震构造区边界的依据。
重水堆重型设备开顶法吊装(The Open-top Lifting Method for Heavy Equipments in CANDU6 Project )
核电站 大型设备 吊装
2008/10/7
介绍了开顶法吊装的先决条件、吊装方法及安全技术措施,并与传统的吊装工艺进行了对比,同时也指出了开顶法吊装中存在的问题,对今后的核电施工有一定的借鉴意义。