搜索结果: 1-1 共查到“林业工程 Reduction”相关记录1条 . 查询时间(0.031 秒)
SETUP TIME REDUCTION ON FOUR-SIDE PLANING MACHINE WITH THE SMED METHOD
wood industry company four-side planing machine setup times SMED method
2009/11/26
Due to the rapidly increasing diversity of products and smaller batch sizes, the setup time reduction is of crucial importance for the profitability of a company. The article deals with the problem of...